Full Nighttime Freeway Closures at Wendy/101 Interchange in Newbury Park Nights of November 5-9 and 13-14
/
The 101 Freeway at Wendy Drive in Thousand Oaks will be closed for bridge construction from Monday, November 5th through Friday, November 9th from 11 PM to 5 AM and on Tuesday, November 13th to Wednesday, November 14th.
Beginning at 7 PM on each closure night, travel along the bridge will be limited to one lane in either direction to allow for mobilization of construction equipment and materials.
Motorists traveling northbound will be directed to exit the freeway at Wendy Drive and immediately re-enter the Freeway by making a left turn and using the northbound on-ramp.
Motorists traveling southbound will be directed to exit the freeway at Wendy Drive, turn right onto Wendy Drive, right onto W. Hillcrest Drive, right onto Rancho Conejo Boulevard/Borchard Road, and then use the US-101 southbound on-ramp loop to re-enter the Freeway.
During the freeway closures, construction will include erecting steel bridge girders utilizing cranes placed on the Freeway. During the closures, 15 steel girder segments up to 100 feet long and weighing over 30,000 pounds each will be placed along the bridge. California Highway Patrol units will be stationed at the off-ramps to ensure traffic is properly detoured.
The 18-month Wendy/101 Interchange Improvement Project is scheduled for completion in August 2013. Residents can visit www.toaks.org/wendy101 to learn more about the project, view detour maps and closures, as well as sign-up for weekly road closure notifications.