Planned Closures of 101 Freeway at Lindero Canyon Road October 28 to November 8
/Reconstruction of the Lindero Canyon Road/101 freeway overpass will force several nighttime and early morning closures of the 101 freeway in both directions. These closures will begin at 11:00 pm on Monday, October 28 and last until 5:00 am the following morning.
Closures will occur Monday through Friday for a two-week period. The final closure will take place Thursday, November 7 at 11:00 pm through Friday, November 8 at 5:00 am.
Motorists will be detoured off the freeway at Lindero Canyon Road in each direction. Northbound motorists will be routed to Thousand Oaks Boulevard and will return to the 101 freeway at Westlake Boulevard. Southbound motorists will be routed to the Reyes Adobe on-ramp via Agoura Road. In addition, both the northbound and southbound on-ramp loops to the 101 freeway will be closed during these late evening and early morning construction periods (11:00 pm to 5 am). However, one lane of traffic on Lindero Canyon Road in each direction over the bridge will remain open.
On the first two successive nights and early mornings of the closure starting on October 28, construction crews will be using jackhammers to demolish portions of the overpass as part of the reconstruction project beginning around 11:30 pm. to 5:00 am. Unfortunately, noise generated by this construction activity may be heard in residential areas adjacent to the work.
While the City is mindful of this temporary inconvenience, unfortunately the schedule of the work is dictated by Caltrans and the need to undertake this phase of the construction work in the late evening and early morning hours to coincide with the temporary closure of the freeway. Nonetheless, the City wishes to thank the community and effected residents in advance for their patience and understanding associated with this aspect of the project.
To sign up for email and text message updates on the Lindero Canyon/101 freeway overpass reconstruction project, please visit www.wlv.org and click on the blue project update icon on the left side of the homepage.
When this project is completed, the Lindero Canyon Road/101 bridge will have an additional lane in each direction of traffic, aesthetic improvements, an 11 foot wide lit pedestrian walkway on the east side and a 300 foot long sculpture on both sides of the bridge that will feaure iconic scenes of the City of Westlake Village by artist Joe Werthheimer.